AUDIT OF HOUSING LAND IN DUNDEE AND ANGUS 2004 PRODUCED JOINTLY BY ANGUS COUNCIL AND DUNDEE CITY COUNCIL Planning and Transportation Department Planning & Transport Dundee City Council Angus Council Tayside House St James House Crichton Street St James Road DUNDEE FORFAR DD1 3RB DD8 2ZP CONTENTS Section 1 : Introduction Section 2 : General Principles Section 3 : Consultation Section 4 : Dundee & Angus Housing Market Areas Section 5 : Dundee City Section 6 : Angus Section 7 : Completions Appendix 1 : Effectiveness Criteria Appendix 2 : Glossary and Terms SECTION 1 : INTRODUCTION The annual audit of housing land provides a factual statement of land supply within the administrative boundaries of Dundee City Council and Angus Council. Only sites with a capacity of 5 or more units are included. The audit is the result of a survey undertaken in June 2004. The audit is an important source of information for the monitoring of the Dundee and Angus Structure Plan, approved by Scottish Ministers in October 2002. This Plan uses Housing Market Areas as a basis for assessing housing land requirements. The audit gives details of the land supply in each of the council areas and is presented for each of the 4 housing market areas in the Dundee and Angus Structure Plan area. SECTION 2 : GENERAL PRINCIPLES The Audit provides a range of information relating ...

Informations

Publié par
Nombre de lectures 158
Langue English

Extrait







AUDIT OF HOUSING LAND
IN
DUNDEE AND ANGUS
2004
















PRODUCED JOINTLY BY
ANGUS COUNCIL
AND
DUNDEE CITY COUNCIL














Planning and Transportation Department Planning & Transport
Dundee City Council Angus Council
Tayside House St James House
Crichton Street St James Road
DUNDEE FORFAR
DD1 3RB DD8 2ZP CONTENTS



Section 1 : Introduction

Section 2 : General Principles
Section 3 : Consultation
Section 4 : Dundee & Angus Housing Market Areas

Section 5 : Dundee City
Section 6 : Angus
Section 7 : Completions

Appendix 1 : Effectiveness Criteria
Appendix 2 : Glossary and Terms SECTION 1 : INTRODUCTION


The annual audit of housing land provides a factual statement of land supply within the
administrative boundaries of Dundee City Council and Angus Council. Only sites with a
capacity of 5 or more units are included. The audit is the result of a survey undertaken in
June 2004.

The audit is an important source of information for the monitoring of the Dundee and Angus
Structure Plan, approved by Scottish Ministers in October 2002. This Plan uses Housing
Market Areas as a basis for assessing housing land requirements. The audit gives details of
the land supply in each of the council areas and is presented for each of the 4 housing
market areas in the Dundee and Angus Structure Plan area.
SECTION 2 : GENERAL PRINCIPLES

The Audit provides a range of information relating to each housing site. The schedules in
Sections 5 and 6 are grouped by “effective supply” and “constrained supply” as defined by
Planning Advice Note 38 Housing Land (Revised 2003). Each site has a unique site
reference followed where appropriate by the Local Plan reference, the name of the site and
the developer or applicant. The status of the site relates to whether the site is under
construction, identified in a local plan or has planning permission or other Council approval.
The approval date given refers to the date of publication of the relevant local plan or the date
the latest planning permission was issued. The number of houses still to be completed on
each site is included and an assessment is made of the potential yield from the site in the
programming columns. Details of the number of completions in the preceding year are
included in the schedules.

Within the Angus Council area the housing market area within which sites are located is
included. All sites in the Dundee City Council area fall within the Dundee and South Angus
housing market area.

Housing sites have been monitored since 1979 and in arriving at the potential yield figures,
due account has been taken of past trends and completions, anticipated starts and
comments from private house builders and other housing providers. It must be emphasised
however, that the potential yields are only indicative and the actual yields may vary.

The last component of this audit sets out the number of completions recorded on sites of five
or more houses for each settlement/area. Also included for the Angus Council area is the
aggregate number of dwellings expected to come forward on small sites (less than 5 units).
They are included in the schedule of effective sites, given they are either under construction
or have a valid planning permission, but are not counted towards meeting the housing land
requirement for Angus set out in the Dundee and Angus Structure Plan. The Structure Plan
makes no specific allowance for small sites in determining the housing land requirements
but recognises their contribution in augmenting the effective supply of land.

FINALISED DUNDEE LOCAL PLAN REVIEW

Dundee City Council approved the Finalised Dundee Local Plan Review in January 2003.
This plan allocates housing land in accordance with Schedule 1 of the Dundee and Angus
Structure Plan.

The Finalised Local Plan was published in April 2003 and formal objections were invited.
Objections that were not withdrawn were considered at a Public Local Plan Inquiry held
between April and June 2004. Sites that have been allocated for housing in the Finalised
Dundee Local Plan Review have been included in the established land supply and thereafter
tested for effectiveness against the criteria in PAN 38 (Revised 2003). SECTION 3 : CONSULTATION

The Audit has been the subject of consultation with Communities Scotland, Homes for
Scotland, the public via the Angus and Dundee City Council Internet sites and through
advertisement in the local press.

In drawing up the Housing Land Audit for 2004, the Angus and Dundee City Councils have
had full regard to the revised PAN 38 Housing Land (Revised 2003) which includes the
following definition of effective housing land supply.

“........the part of the established housing land supply that is expected to be free of
constraints in the period under consideration, and will therefore be available for the
construction of housing.”

The assessment of effectiveness of the sites identified in the 2004 Audit has been carried
out having regard to the criteria set out in Paragraph 29 and summarised in Appendix 1 of
this report. SECTION 4
DUNDEE AND ANGUS HOUSING MARKET AREAS
HOUSING LAND SUPPLY AND POTENTIAL OUTPUT (June 2004)(sites of 5+ houses)
PRIVATE SECTOR PROGRAMMING ON EFFECTIVE SITES
2004/ 2005/ 2006/ 2007/ 2008/ 2004 to Later Constrained Established
2005 2006 2007 2008 2009 2009 Years Sites Sites
ABCDE A+B+C+D+E
ARBROATH 7 50 106 81 23 267 0 26 293
ARBROATH HMA LANDWARD 11 30 18 16 10 85 0 20 105
Arbroath HMA Total 18 80 124 97 33 352 0 46 398
BRECHIN 5 25 36 20 20 106 13 80 199
MONTROSE 24 71 95 74 58 322 290 30 642
BRECHIN/MONTROSE HMA LANDWARD 24 8 20 6 0 58 0 60 118
Brechin/Montrose HMA Total 53 104 151 100 78 486 303 170 959
FORFAR 61 48 71 53 0 233 0 115 348
KIRRIEMUIR 0 4 23 19 11 57 0 0 57
FORFAR/KIRRIEMUIR HMA LANDWARD 9 26 27 17 2 81 0 0 81
Forfar/Kirriemuir HMA Total 70 78 121 89 13 371 0 115 486
CARNOUSTIE 53 62 59 30 14 218 0 90 308
MONIFIETH 26 3 23 10 0 62 0 0 62
SOUTH ANGUS HMA LANDWARD 75 100 77 55 50 357 34 157 548
DUNDEE GREENFIELD 129 200 253 247 220 1049 256 236 1541
DUNDEE BROWNFIELD 548 680 665 487 296 2676 147 284 3107
Dundee and South Angus HMA Total 831 1045 1077 829 580 4362 437 767 5566
DUNDEE AND ANGUS 972 1307 1473 1115 704 5571 740 1098 7409SECTION 5
DUNDEE CITY
HOUSING LAND SUPPLY AND POTENTIAL OUTPUT (June 2004)(sites of 5+ houses)
PRIVATE SECTOR PROGRAMMING ON EFFECTIVE SITES
2004/ 2005/ 2006/ 2007/ 2008/ 2004/ Later Constrained Established
2005 2006 2007 2008 2009 2009 Years Sites Sites
DUNDEE GREENFIELD 129 200 253 247 220 1049 256 236 1541
DUNDEE BROWFIELD 548 680 665 487 296 2676 147 284 3107
DUNDEE CITY - GREENFIELD SITES
5 Yr
Effective
EFFECTIVE SUPPLY OVER FIVE YEAR PERIOD - PRIVATE SECTOR
SITE REF L' PLAN SITE NAME DEVELOPER STATUS LAST AREA(ha) CAPACITY UNITS TO LATER
REF APPROVAL BUILD 04-05 05-06 06-07 07-08 08-09 2004-2009 YEARS
PRIVATE SECTOR
199011 HS51 EMMOCK WOODS BALDRAGON HOMES 18.2 95 77 40 37
CONS 26/08/2002 77
9530 HS42 FINTRY PLACE PRIVATE ALPL 1.3 6 6 33 6
199536 HS52 BALLUMBIE FARM PH1 DJ LAING 9 200 82 30 25 20 7
CONS 25/08/2003 82
ALPL 35
199538 HS50 TROTTICK DISCOVERY HOMES 2.37 35 35 15 20
199725 SOUTH OF ARBROATH RD PH1 WIMPEY HOMES CONS 05/06/1998 11.04 210 101 10 25 25 25 85 16
DEPC 25/04/2000 21
200005 AREA C, NINEWELLS AVENUE H&H PROPERTIES 1.48 24 21 21
200201 ELCHO DRIVE 29/09/2003 20 13 13 13
200345 HS51 EMMOCK WOODS (Later Stages) PRIVATE ALPL 0 60 60 152520 60
200358 H69 BALLUMBIE DJ LAING 1.51 10 10 5 5
FLPL 10
200409 H70 WESTERN GATEWAY LIFF DUNCARSE 28.31 250 250 20 30 30 30
FLPL 110 140
200408 H70 WESTERN GATEWAY SWALLOW BETT/CALA 15.82 270 270 25 75 75 75
FLPL 250 20
200357 H67 BALDRAGON BETTS 7.54 130 130 20 40 40 30
FLPL 130
200359 H71 BALGILLO NORTH AWG 9 150 150 10 20 20 20
FLPL 70 80
200360 H72 BALMOSSIE STEWART MILNE FLPL 7.22 100 100 5 25 25 25 20 100
TOTAL PRIVATE SECTOR EFFECTIVE 1560 1305 129 200 253 247 220 1049 256
CONSTRAINED SITES - PRIVATE SECTOR
SITE REF L' PLAN SITE NAME DEVELOPER STATUS LAST AREA(ha) CAPACITY UNITS TO NATURE OF OTHER
REF APPROVAL BUILD 04-05 05-06 06-07 07-08 08-09 TERM CONST FACTORS
9810 HS53 PITKERRO MILL UNKNOWN ALPL 066 PHY
FLPL LAND USE
200356 H70 WESTERN GATEWAY, SOUTH BETT/CALA 14.96 230 230
PRIVATE SECTOR
TOTAL PRIVATE SECTOR NON-EFFECTIVE 236
TOTAL ESTABLISHED SUPPLY 1541
LOCAL PLAN REF HS-Adopted Local Plan H-Finalised Local Plan
CONSTRAINT OWN=OWNERSHIP PHY=PHYSICAL(ON-SITE) CON=CONTAMINATION DEF=DEFICIT FUNDING NOT COMMITTED PRO=PROGRAMMING INF=INFRASTRUCTURE LAN=LAND USE MAR=MARKETABILITY
STATUS CONS=UNDER CONSTRUCTION OUPC=OUTLINE PLANNING CONSENT DEPC=DETAILED PLANNING CONSENT FLPL= FINALISED LOCAL PLAN SITE DEL=LIKELY TO BE DELETED
OCAP=OTHER COUNCIL APPROVAL ALPL=APPROVED LOCAL PLANHOUSING LAND SUP