-
206
pages
-
English
-
Ebooks
-
2016
Description
Engage Literacy LEVELS 1–2 TEACHER’S RESOURCE Extended Edition Lisa Thorpe and Lauren Oxley LEVELS 1–2 Engage Literacy TEACHER’S RESOURCE Extended Edition Lisa Thorpe and Lauren Oxley Engage Literacy is published by Capstone and distributed in Australia and New Zealand by Lioncrest Education. Capstone Global Library Limited is a company incorporated in England and Wales having its registered office at 7 Pilgrim Street, London, EC4V 6LB – Registered company number: 6695582 www.lioncrest.com.au/engageliteracy Copyright 2016 by Capstone. All rights reserved. Blackline masters can be reproduced for use in individual classrooms. No other part of this publication may be reproduced in whole or in part, or stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of Capstone Global Library Limited.
-
Publié par
-
Date de parution
01 août 2016
-
EAN13
9781474735865
-
Langue
English
-
Poids de l'ouvrage
39 Mo