-
1
page
-
English
-
Documents
Description
2544 Federal Register/Vol. 73, No. 10/Tuesday, January 15, 2008/Notices Signed at Washington, DC, this 7th day of standards require that the agency sites. All impoundments and hazardous January, 2008. approve prudently engineered design refuse piles are required by the Elliott S. Kushner, plans for dams and their standards to be constructed and Certifying Officer, Division of Trade impoundments, as well as the plans for operated in an approved manner. In Adjustment Assistance. hazardous refuse piles that are routinely addition, coal mine operators frequently [FR Doc. E8–593 Filed 1–14–08; 8:45 am] constructed by coal mine operators. revise construction plans to Plan revisions are also required to be BILLING CODE 4510–FN–P accommodate mining conditions, cycles submitted for approval. In addition, the or markets. Since these revisions to the standards also require plans when one structures can adversely affect a great DEPARTMENT OF LABOR of these sites is to be abandoned. And number of people, such changes are plans are required when spontaneous required to be planned in a prudent Mine Safety and Health Administration fires erupt and need to be extinguished manner and approved by the agency. at the burning site. Records of weekly Fire extinguishing plans are only Proposed Information Collection inspections and instrument monitoring Request Submitted for Public required from an operator when a are also required to ensure that the sites Comment and ...
-
Publié par
-
Langue
English