-
20
pages
-
English
-
Documents
Description
Responses to Public Comments Received on First Coment Draft of LEED-EB Comment Period was Open: 03/01/04 - 03/30/04)Document Date: June10, 2004Proposed Issue Date Changes to LEED- Type of Category Comment # Credit Likes and Dislikes Ways To Improve Language Changes ResponsesSummaries Submitted EB for Second ChangeComment DrafttPrereq 1 The person responsible for the ongoing Make changes ClarificationNeed to define who can sign off. Is this Sign off (Erosion & There is a requirement for "Sign implementation of this plan within the organization included in SS SSp1-Com1 the permitting agency, architect, civil Define who. 2/12/2004responsibility Sedimentation off of the erosion control plan" that owns / operates the building. Response Columnengineer or who.Control)This prerequisite requires Erosion and sedimentation control can be No Change Noneconsiderable expense to achieve implemented for vegetated areas and for hard Prereq 1 It should be a credit where sites are 30% for sites that are not mostly surfaced areas. Required level of (Erosion & or more vegetated and NA to mostly SS SSp1-Com2 paved. It is NA to sites that are 2/12/2004achievement Sedimentation paved sites. Would be fair to facilities mostly paved except for the Control) trying to maintain green space.construction requirement which is covered elsewhere.This prerequisite requires a policy designed to No Change NoneThere are few things I am prevent erosion and sedimentation and address ...
-
Publié par
-
Langue
English