-
18
pages
-
English
-
Documents
Description
DIVISION RESPONSE TO PUBLIC COMMENTS – STORMWATER CONSTRUCTION GENERAL PERMIT – PART I 3/23/07 *To simplify review, references to sections of the permit and rationale in the comments summarized in this document correspond to the draft being distributed as part of this public notice. Note that this is true even when the comments may be referring to the previous draft. # CATEGORY CHANGES TO PERMIT AND/OR RATIONALE 1 Application Changes i. Comment(s): Comment was received requesting that the permit application be changed to require information on where the n/a SWMP will be kept. • Most construction sites undergo significant changes while construction is occurring. It is expected that the SWMP location may change over time, and thus it would be impractical to require this information in the application. 2 Time Frames i. Comment(s): It was noted that some of the time frames listed in the permit specify a number of days, but do not indicate whether Permit: Various locations these are calendar or business days. • The permit has been clarified to indicate that all time frames refer to calendar days. 3 Conflicting Agency Requirements i. Comment(s): Concern was expressed that requirements from other government agencies may conflict with the requirements of the n/a Stormwater Construction Permit. • The Division is aware of no requirements from other State, local, or federal agencies that would result in a conflict with the Stormwater ...
-
Publié par
-
Langue
English