-
3
pages
-
English
-
Documents
Description
Lighting Audit ReportReference; Prepared By: Richard EllisVersion: 1.0Lighting Audit Report 8/18/2009typicalBuilding:ZoneID 1.00 Location: Front Office Area Common Proposed ActionExisting Fixture1I0065 -RC Lamp ReplacementProposed Fixture1-CFL-16W R- Par 30 Flood DescriptionRetro 16W CFL Par 30 Flood Total Installation CostNumber of Fixtures Average Watts per Fixture Annual Usage Annual Electric Cost$268.81 65 Existing: 12 2,860 $267.70 Annual Savings 16 Proposed: 16 2,860 $87.86 $183.84 Break Even Point (yrs)Lighting Electric Lighting Material Kilowatts (KW) Kilowatt-hours (KWH) 1.46Saved: $179.84 $4.00 1 1,499 ZoneID 1.00 Location: Front Office Area Common Proposed ActionExisting Fixture4F40SES -34W 2X4 Troffer Remove & Install Recessed FixtureProposed Fixture3F30EEL - NF-CRE 2x4 Pris TrofDescriptionNF 2x4 3L 30W Prismatic Troff HP T8 BF L Total Installation CostNumber of Fixtures Average Watts per Fixture Annual Usage Annual Electric Cost$2,590.60 160 Existing: 24 2,860 $1,317.89 Annual Savings 69 Proposed: 24 2,860 $568.34 $781.55 Break Even Point (yrs)Lighting Electric Lighting Material Kilowatts (KW) Kilowatt-hours (KWH) 3.31Saved: $749.55 $32.00 2 6,246 Please note that this report does not include rebate or occupancy sensor informationLighTec, Inc. - Precision Engineered Lighting and Energy Management Solutions - 35 Depot Street - Merrimack, New Hampshire 03054 Page 1 of 3Lighting Audit ...
-
Publié par
-
Langue
English