-
12
pages
-
English
-
Documents
Description
Responses to Public Comments Received on First Coment Draft of LEED-EB Comment Period was Open: 03/01/04 - 03/30/04)Document Date: June10, 2004Issue Proposed Changes to LEED-EB for Category Comment # Credit Likes and Dislikes Ways To Improve Language Changes Responses Type of ChangeSummaries Second Comment DraftFor building envelope commissioning for all buildings, we propose the following five step process: (This is listed in two papers pending publication) Additionally, there are several firms Building envelope commissioning is not included in the requirements for existing building. The heat, (ours included) who have already completed air, and moisture transfer systems, including the rainwater management system, of any existing building envelope commissioning projects for As noted above, please consider adding language that requires building envelope building needs to be examined as part of this process. (This also holds true for all of the other LEED LEED buildings, including one LEED building commissioning as follows: Commissioning of the building envelope, by computer products dealing with the building exterior, including LEED NC and LEED Core and Shell). Buildings where an envelope investigation was completed modeling, and drawing and field analysis to examine heat, air, and moisture can degrade due to water ingress, shortening their longevity and durability, requiring replacement of Building Prereq 1 (Existing after the fact due to a systematic ...
-
Publié par
-
Langue
English