JUNE 2009 COMMENT SUMMARY Introduction In June 2009, 91 comments were submitted to the Alaskan Way Viaduct and Seawall Replacement Program. Comment format and origin Comment FormatE-mails9Letters/Comment2511FormsWeb site9Phone/Hotline37Other Comments and questions received at outreach events are summarized separately. Comment categories We have six comment categories: transportation, design/construction, economic, transit, environmental/public safety and structures/locations. Each comment submitted is categorized by the content of the message. Please note that some comments fit into more than one category, while others do not fit into any of the categories. The bullet points below were extracted from the June comments. Transportation: This category includes comments related to traffic, connections/circulation, pedestrians and bicycles. In June, there were 15 comments in this category. Below is a sampling. • Have you completed an origins and destinations traffic study for the existing viaduct? • How will you mitigate the increased traffic from the bored tunnel’s north portal around the surface streets at the Seattle Center neighborhoods? • With the bored tunnel, there seems to be less throughput possible – we need more access, not less. Design/Construction: This category includes comments related to construction, urban design, the seawall and engineering. In June, there were 13 comments in this category. Below is a ...
-
Publié par
-
Langue
English