-
8
pages
-
English
-
Documents
-
2013
Description
Nexterra Receives Order From MWH forNexterra Receives Order From MWH for Biomass Gasification System to Anchor 10 MW Renewable Energy Power Plant in Birmingham, UK PR Newswire VANCOUVER and BIRMINGHAM, England, December 12, 2013 Nexterra Systems Corp. (http://www.nexterra.co.uk), a global leader in energy-from-waste gasification systems, announced today that it has signed a contract with MWH to supply a biomass gasification system for the Birmingham Bio Power Ltd. (BBPL) renewable energy power plant in Tyseley, UK. Developed by Carbonarius, the plant will be capable of producing over 10 MW of renewable electricity for sale to the grid. The project will create more than 100 engineering, project management and construction jobs and 19 full time jobs on site once operational. The Nexterra gasification system is a cornerstone of the £47.8 million project that will use 67,000 tonnes/year of locally-sourced class A - C recovered wood diverted from landfills to produce steam that will be converted into electricity through a steam turbine and generator system. The plant will supply enough electricity to power 17,000 homes and is expected to reduce greenhouse gas emissions (CO2e) by 107,000 tonnes per annum. Nexterra will design and supply the complete biomass gasification-to- steam generation system from feedstock handling to emission controls, including four gasifiers, a high pressure boiler, and a flue gas treatment system.
-
Publié par
-
Publié le
12 décembre 2013
-
Langue
English