-
3
pages
-
English
-
Documents
Description
Brixton Metals Drills Best Intercept to Date at Oban: 310m of 223 g/t AgEq Including 123m of 402 g/t AgEq (190.68 g/t Ag, 1.19 g/t Au, 3.25% Zn and 1.74% Pb) PR Newswire VANCOUVER, November 26, 2012 VANCOUVER, November 26, 2012 /PRNewswire/ -- Brixton Metals Corporation (TSXV: BBB) (the "Company" or "Brixton") is pleased to announce the balance of its phase two, 2012 drilling results at the Thorn project, located in Northwest British Columbia, Canada. This latest phase of drilling has culminated in the assaying of one of the best drill intercepts to date at Oban, expanding the zone to depths previously untested. Highlights THN12-84 intercepted 123.00m of 402.52 g/t AgEq (190.68 g/t Ag, 1.19 g/t Au, 3.25% Zn, 1.74% Pb and 0.06% Cu) within broader intervals of 201.00m of 303.64 g/t AgEq and 310.00m of 223.52 g/t AgEq The interpreted apparent width of the Oban zone has increased up to 140m, depth to 325m and strike of 130m THN12-85 combined with hole THN11-57 show a zonation in metal content with increasing copper grades at depth Mr. Gary R. Thompson, Chairman and CEO stated, "The Oban zone continues to display outstanding drill results. This latest spectacular intercept is a testament to the project's potential, setting the stage for further volume building with high grade metal content." Mr.
-
Publié par
-
Langue
English