-
3
pages
-
English
-
Documents
Description
Brixton Expands The Oban Breccia Zone, Cutting One of the Widest High Grade Sections to Date: 150.50m of 314.59g/t AgEq Including 73.70m of 466.28g/t AgEq PR Newswire VANCOUVER, November 5, 2012 VANCOUVER, November 5, 2012 /PRNewswire/ -- Brixton Metals Corporation (TSXV: BBB) (the "Company" or "Brixton") is pleased to announce the completion of the phase two, 2012 drill program and soil sampling program at its Thorn project, located in Northwest British Columbia. A total of 1,738m were drilled in 13 NQ diamond drill holes. The depth of the holes ranged from 45m to 338m. Additional drill results from holes THN12-81,82 and 84 - 87 as well as soil sample results are pending and shall be released upon receipt from the laboratory. Highlights THN12-83 intersected 73.70m of 466.28g/t AgEq (284.15g/t Ag, 1.49g/t Au, 1.31% Pb and 1.78% Zn) within a broader interval of 150.50m of 314.59g/t AgEq (165.30g/t Ag, 1.37g/t Au, 0.92% Pb and 1.25% Zn) Established a newly interpreted true width zone of 100m, a depth of 300m and a minimum strike length of 130m Recent drilling has expanded the high-grade mineralization at the Oban breccia zone at depth to the south- southeast by 70m Mr. Gary R. Thompson, Chairman and CEO, stated, "Drilling continues to produce high-grade intercepts near surface and at depth at the Oban breccia zone, with hole THN12-83 returning impressive gold-silver results.
-
Publié par
-
Langue
English