-
19
pages
-
English
-
Documents
Description
Audit of the Post-Project Condition of Roads and Bridges Constructed in Honduras Under the Emergency Reconstruction of Roads and Bridges Activity Audit Report No. 1-522-04-006-P March 3, 2004 San Salvador, El Salvador March 3, 2004 MEMORANDUM FOR: USAID/Honduras Mission Director, Paul Tuebner FROM: Acting Regional Inspector General/San Salvador, Christine M. Byrne SUBJECT: Audit of the Post-Project Condition of Roads and Bridges Constructed in Honduras Under the Emergency Reconstruction of Roads and Bridges Activity (Report No. 1-522-04-006-P) This memorandum is our report on the subject audit. In finalizing this report, we considered your comments on our draft report and have included your response in Appendix II. The report includes one recommendation. Since USAID/Honduras has taken final action on the recommendation, the recommendation is closed on issuance of this report. Once again, thank you for the cooperation and courtesy extended to my staff throughout the audit. 1 This page intentionally left blank. 2 Table of Summary of Results 5 Contents Background 5 Audit Objective 6 Audit Findings 6 Were USAID/Honduras-financed roads and bridges in adequate condition one year after the project completion date? 6 Condition of Roads 7 Condition ...
-
Publié par
-
Langue
English